MinoSenko On-Site Installation Service Cost Policy
Professional On-Site Installation Support with Transparent Service Cost Calculation
MinoSenko provides professional on-site installation, commissioning, and technical support services for industrial equipment and automated production systems worldwide. The MinoSenko On-Site Installation Service Cost Policy is designed to provide customers with a clear understanding of overseas technical service expenses and ensure a transparent cooperation process.
MinoSenko calculates installation service costs according to the actual expenses required for each project. The final cost depends on the equipment type, installation complexity, engineer working period, destination country, and local service conditions.
The installation service cost mainly includes engineer service fees, transportation expenses, visa and insurance costs, accommodation, and other necessary business travel expenses. MinoSenko follows a practical calculation method to ensure customers receive professional technical support with reasonable and transparent pricing.

Installation Service Cost Structure
Engineer Technical Service Fee
For overseas installation, commissioning, and production support, MinoSenko charges:
USD 150 / person / day
The engineer service fee covers equipment installation guidance, machine commissioning, parameter adjustment, production testing, and operator training during the service period.
The required number of engineers and working days depends on the equipment configuration, project requirements, factory conditions, and customer production schedule.

Travel Expenses
Travel expenses are calculated according to the actual costs generated during the engineer’s business trip.
These costs may include international or domestic flight tickets, airport transfers, local transportation, and other necessary travel arrangements during the installation period.
Before the engineer’s departure, MinoSenko will communicate the travel plan and estimated expenses with customers to ensure efficient project preparation.

Visa and Insurance Costs
Visa requirements and travel regulations vary between different countries. Therefore, related expenses are calculated according to the actual requirements of each project location.
These costs may include visa application fees, travel insurance, required documents, and other necessary service charges.
MinoSenko adjusts these expenses based on the destination country’s regulations and the actual conditions of the installation project.

Accommodation and Living Expenses
Accommodation and daily living expenses depend on the local cost level of each country and city.
The actual expenses may include hotel accommodation, local meals, daily transportation, and other reasonable business travel costs.
MinoSenko considers regional differences when preparing installation service quotations to provide accurate and practical cost estimates.

Example of Installation Service Cost Calculation
The following example shows how the MinoSenko On-Site Installation Service Cost Policy is applied to an overseas equipment installation project.
For a typical installation project, the total service cost includes the engineer service fee, actual travel expenses, visa and insurance costs, accommodation, and local living expenses.
Engineer Service Fee:
1 engineer × 10 working days × USD 150/day = USD 1,500
Travel Expenses:
Actual flight tickets and transportation costs
Visa & Insurance:
Actual cost according to destination country requirements
Accommodation & Meals:
Actual local expenses during the installation period
Total Installation Cost:
Engineer service fee + actual travel expenses + necessary local expenses
Overseas Installation Project Reference
The following example is based on an actual overseas equipment installation project. Customer information has been removed for confidentiality.
The project required three MinoSenko technical personnel to provide on-site installation support for 10 working days, including two field engineers and one project manager.
Because the installation site was located in a major international city, local accommodation, meals, and transportation costs were higher than some other regions. The final service cost was calculated according to the actual expenses and reasonable local cost standards.
| Role | Travelers | Travel Days | Visa Fee/$ | Insurance/$ | Flight & Transport/$ | Personnel Fee (150$/Day) | Accommodation (150$/Day) | Meal Fee (50$/Day) | Local Transport (30$/Day) | Subtotal/$ |
|---|---|---|---|---|---|---|---|---|---|---|
| Field Engineer A | 1 | 10 | 360 | 100 | 1800 | 1500 | 1500 | 500 | 300 | 5760 |
| Field Engineer B | 1 | 10 | 360 | 100 | 1800 | 1500 | 1500 | 500 | 300 | 5760 |
| Project Manager | 1 | 10 | 360 | 100 | 1800 | 1500 | 1500 | 500 | 300 | 5760 |
Based on this example, the individual service cost includes visa, insurance, transportation, engineer service fees, accommodation, and meals. Each person’s total expense was USD 5,760.
The shared local transportation cost was calculated separately. The total cost for this 3-person, 10-day overseas installation project was USD 17,580.
Flexible Global Installation Support
MinoSenko provides professional installation and commissioning services for customers in Europe, North America, Asia, and other international markets.
Each project receives a customized service plan based on equipment type, project scale, factory installation conditions, local regulations, project schedule, and customer production requirements.
With professional engineering experience and transparent cost management, MinoSenko helps customers complete equipment installation efficiently and achieve stable machine operation.
The MinoSenko On-Site Installation Service Cost Policy provides customers with a reliable and practical solution for overseas installation support, technical commissioning, and long-term equipment service cooperation.